Update Results
B&K Hybrid Solutions join the University of Sheffield Mentor Scheme
B&K Hybrid Solutions recently joined the University of Sheffield’s Mentor Scheme, welcoming a group of engineering students to Paradise SE11.
Read More
Intumescent Fire Protection Painting
BKHS are proud to offer offsite intumescent fire protection painting services.
Read More
Panattoni Park Brighton - Project Update
This multi-unit scheme has seen BKHS design, fabricate and erect 575 tonnes of hot rolled structural steelwork and 165 tonnes of cold rolled steelwork. 
Read More
B&K Hybrid Solutions support TDUK Embodied Carbon Database
B&K Hybrid Solutions were proud to support the development of this much needed document, which we believe is a fantastic step forward for the industry.
Read More
Walworth Town Hall – Project Update
Last year B&K Structures finished on site at Walworth Town Hall – a sensitive re-modernisation project showcasing the retrofit benefits of a hybrid...
Read More
Port Talbot
B&K Hybrid Solutions are pleased to share these latest site pictures from Port Talbot, where our team are delivering a large-scale structural steelwork unit...
Read More
Skelton Lake Services
B&K Structures designed, fabricated and installed the ambitious superstructure - utilising the visual and structural benefits of a hybrid CLT, glulam, structural...
Read More
Intricate Fabrication
A great example of intricate fabrication – designed, detailed and delivered by the BKHS team – coming together on our factory floor.
Read More
Pre-Construction Director Lee Roberts sat down with The Structural Timber Association Ltd
B&K Structures' Pre-Construction Director Lee Roberts recently sat down with The Structural Timber Association Ltd to discuss his experience with mass...
Read More

Download file

Please enter your details below to download the file.