B&K Hybrid Solutions are now on site at Panattoni Park Brighton, delivering a multi-unit speculative industrial facility on behalf of Glencar.

Due to be completed in Spring 2024, B&K Hybrid Solutions have been appointed to design, fabricate and erect 575 tonnes of hot rolled structural steelwork and 165 tonnes of cold rolled steelwork. The speculative industrial five-unit scheme exemplifies our capabilities and credentials within this sector, where we are consistently producing high quality portal frames, on time and to an exceptional standard.

Panattoni Park Brighton is being developed speculatively and comprises of five new build industrial and logistics units ranging from 19,000 to 53,700 sq ft. The project, situated adjacent to Brighton City Airport, includes works to the public highway and is targeted to be a BREEAM excellent development. When completed, it deliver much-needed Grade-A space within this fast-growing region ideally set-up for last mile delivery operations looking to address consumer markets clustering the south coast.

We are delighted to be working alongside Glencar delivering yet another Panattoni UK project, contributing to Europe’s largest developer of logistics property’s impressive portfolio.

Lee Roberts, Pre-Construction Director: “Panattoni Park Brighton is a project that really showcases our expertise in the multi-unit industrial steelwork sector. Aided by our in-house team of Draughtsmen and Structural Engineers, we are able to control programme time and the build sequence to maximise efficiency on site. Our state-of-the-art manufacturing facility is particularly suited to multi-unit schemes – able to fabricate 10,000 tonnes per year – and we are looking forward to watching this project come to life.”

Back to News
Date
07/12/2023
Category
Project News
Article Author
B&K Structures

Download file

Please enter your details below to download the file.